The long-term agreement covers future subsea cable infrastructure across northern Scotland, according to Van Oord.
Van Oord announced on 9 July 2026 that its consortium with Sumitomo Electric had signed a long-term framework agreement with SSEN Transmission for future High Voltage Direct Current (HVDC) subsea transmission infrastructure across the north of Scotland.
According to Van Oord, the agreement covers engineering, supply, transport and installation of HVDC subsea cable systems. It includes initial design and engineering work for the proposed 525 kV Shetland 2 HVDC link.
Offshore & Marine InfrastructureDredging Contracts & Industry NewsDredging Equipment & TechnologyStart a project
Cross-reference
Products for this kind of work
In stockCutter suction
HID Dredging HID-CSD-4518
to 14 m · RFQ

Cutter suction
Royal IHC Spartacus
to 45 m · RFQ

Cutter suction
Royal IHC D'Artagnan
to 35 m · RFQ

Cutter suction
HID Dredging HID-CSD-7530
to 22 m · RFQ

Cutter suction
Jan De Nul Ibn Battuta
to 35 m · RFQ

Cutter suction
CHEC / Qidong Tian Kun Hao
to 35 m · RFQ