Insights
Sand source matters
Suitable borrow areas close to the site cut transport cost and time.
Hopper + pipeline
Large hoppers sail and pump ashore; cutters pump directly through long pipelines with boosters.
Ground improvement
Fill usually needs compaction or vertical drains before construction.
Dredgers that can do it
Full catalogue →
In stockCutter suction
HID Dredging HID-CSD-4518
to 14 m · flow 3,000 m³/h · RFQ

Trailing suction hopper
Jan De Nul (Spain build) Cristóbal Colón
to 155 m · ~15,000 m³/h · RFQ

Trailing suction hopper
Jan De Nul (Spain build) Leiv Eiriksson
to 155 m · ~15,000 m³/h · RFQ

Trailing suction hopper
Royal IHC Congo River
to 70 m · ~12,000 m³/h · RFQ

Trailing suction hopper
Royal IHC Vox Maxima
to 70 m · ~11,000 m³/h · RFQ

Trailing suction hopper
Royal IHC Willem van Oranje
to 70 m · ~10,000 m³/h · RFQ

Trailing suction hopper
Royal IHC Volvox Terranova
to 60 m · ~9,000 m³/h · RFQ

Trailing suction hopper
Royal IHC Bonny River
to 60 m · ~8,000 m³/h · RFQ

Trailing suction hopper
Royal IHC TSHD 8,000 m³ (custom)
to 45 m · ~5,000 m³/h · RFQ
Latest land reclamation news
Loading news…
Frequently asked questions
Trailing suction hopper dredgers and cutter suction dredgers with long discharge pipelines and booster stations.
Have a land reclamation project?
Tell us soil, volume and time frame — we match the dredgers and owners who can do it.
Start a project